Experiment | End date |
Friend | Result | Problem |
Text |
EB051 | 2012-03-09 | Geert Kuper | Success | None | No known problems. |
EG049D | 2012-03-13 | Geert Kuper | Success | None | No known problems. |
EJ010 | 2012-03-14 | Geert Kuper | Success | None | No known problems. |
EL042 | 2012-02-26 | Geert Kuper | Minor failures | RECO | Diskpack OSOD-046 sometimes error messages during scancheck. Also LED o/1 was not lit during recording. Therefore switched to fresh diskpack at 09:58 UT. |
EM071D | 2012-02-24 | Geert Kuper | Success | None | None |
EP076A | 2012-03-05 | Geert Kuper | Minor failures | None | At 09:38 UT RTA was taken out the addder for maintenance; At 09:47 UT lost 3 minutes due to restart observation (TADU error); At 10:37 UT RTB was also taken out of the adder box for maintenance; At 10:40 UT lost 3 minutes due to restart observation (TADU error); At 11:37 UT RTA and RTB back in adding. Also lost 3 minutes due to restart. |
EP076B | 2012-03-12 | Geert Kuper | Success | None | No known problems. |
EP081A | 2012-03-07 | Geert kuper | Success | None | No known problems |
EP081B | 2012-03-12 | Geert Kuper | Success | None | No known problens. |
EP081C | 2012-03-13 | Geert Kuper | Success | None | No known problems |
EY018A | 2012-03-08 | Geert Kuper | Minor failures | None | During this whole project we had a mark5B formatter sync error. This will probably result in a large clock offset (139 microsec) but data should be ok. |
F12C1 | 2012-03-07 | Geert Kuper | Failure | PHAS | Westerbork had a serious backend problem. A real time system and a control board of ADC unit 6 were broken. Only the last 2 minutes of this project were recorded. |
F12L1 | 2012-03-02 | Geert Kuper | Success | None | No known problems |
F12X1 | 2012-02-24 | Geert Kuper | Success | None | None |
N12C1 | 2012-03-08 | Geert Kuper | Minor failures | None | During this whole project we had a mark5B formatter sync error. This will probably result in a large clock offset (139 microsec) but data should be ok. FTP fringe results were ok, but the large clock-offset was noticed by Yurii. |
N12L1 | 2012-03-05 | Geert Kuper | Success | None | No known problems |
N12M1 | 2012-02-23 | Geert Kuper | Success | None | None |
N12X1 | 2012-02-26 | Geert Kuper | Minor failures | None | Only 5 channels could be matched, because frequency span |
EE008C | 2012-02-28 | None | None | None | None |
EG061A | 2012-02-29 | None | None | None | None |
F12K1 | 2012-02-28 | None | None | None | None |
N12K1 | 2012-02-29 | None | None | None | None |