EVN feedback tool

Summary for Torun for Session 2013-1

Experiment End date Friend Result Problem Text
EB052A2013-03-02K. BorkowskiSuccessNoneNo known problems.
EB052B2013-03-03K. BorkowskiSuccessNoneNo known problems.
EB052C2013-03-04K. BorkowskiMinor failuresLATEOperator failed to start in time, so the first scan is missing.
EB052D2013-03-05K. BorkowskiMinor failuresRECEPower supply to preamplifiers was off until 5:26 UTC (so most likely no useful data until then).
ED039B2013-03-13K. BorkowskiSuccessNoneNo known problems.
EG066G2013-02-23K. BorkowskiSuccessNoneNo known problems.
EG066H2013-02-24K. BorkowskiSuccessNoneNo known problems.
EK033B2013-02-22K. BorkowskiMinor failuresFSLost a few minutes between 3:25 and 3:35 UTC because of FS hang-up.
EK033C2013-02-26K. BorkowskiSuccessNoneNo known problems.
EM100A2013-03-12K. BorkowskiSuccessNoneNo known problems.
EM100B2013-03-12K. BorkowskiSuccessNoneNo known problems.
EM100C2013-03-13K. BorkowskiSuccessNoneNo known problems.
EM100D2013-03-14K. BorkowskiSuccessNoneNo known problems.
EM100E2013-03-14K. BorkowskiSuccessNoneNo known problems.
EP087A2013-02-26K. BorkowskiMinor failuresRECO LATEShortly before the experiment start our Mk5A recorder switched off completely, on its onwn! Even the power-on button did not work. It took quite a few minutes for operators to wake it from this unusual sleep, therefore start is late by almost 15 minutes. Unfortunately the disk pack used seemed to be too slow for 1Gb/s because many warnings about 'throttled' recording appeared. So at about 22:20 operator decided to change disk-pack and some 10 minutes later recording resumed (on new pack) without
EP087C2013-03-14K. BorkowskiSuccessNoneNo known problems.
ES068A2013-02-22K. BorkowskiSuccessNoneNo known problems.
ES068B2013-02-23K. BorkowskiSuccessNoneNo known problems.
ES068B2013-02-23K. BorkowskiSuccessNoneDuring this e-VLBI session JIVE operators mentioned (on Skype) a small (one lag or so) change in Tr delay. Inspecting the GPS-maser data shows that between 9:45 and 9:50 UTC there was indeed a 0.2 us jump in them (no chance for our operator to note such small jump by looking at the LED display in control room).
ES071A2013-03-01K. BorkowskiSuccessLATE FSOver 1.5 hours late start because the calon command did not work causing hang up of FS on it. The reason was hang-up of one of control computers on the telescope. Useful observations since 9:12 UTC.
ET0282013-03-11K. BorkowskiSuccessNoneOff source from 8:21 for 7 minutes to empty the dish of the collected snow. No other known problems.
EY0192013-02-25K.BorkowskiSuccessNoneNo known problems.
EZ0242013-02-28K. BorkowskiSuccessRECO FSRecorder has stopped writing at 0:20 UT (resumed about 7 minutes later). Some 20 minutes lost due to antenna control problems - resumed at 1:44 UT.
F13C12013-02-21Kaz BorkowskiSuccessNoneNo known problems.
F13C22013-02-21K. BorkowskiSuccessNoneNo known problems.
F13L12013-03-08K. BorkowskiSuccessNoneBefore the third ftp data transfer our internet connection got broken (most likely fiber was damaged/cut somewhere between observatory and Torun). No other known problems.
GK047A2013-03-10K. BorkowskiSuccessNoneNo known problems.
N13C12013-02-25K. BorkowskiMinor failuresFSDue to problems with FS/telescope control one scan near 14:44 got lost.
N13K12013-02-27K. BorkowskiSuccessNoneNo known problems.
N13L12013-03-11Kaz BorkowskiSuccessNoneNo other problems except the earlier (March 8) reported broken fiber. Therefore the ftp data files were transferred with certain delay (through GSM to an auxiliary server in JIVE).
N13M12013-02-28K. BorkowskiSuccessNoneNo known problems.
RO004C2013-02-27K. BorkowskiSuccessNoneNo known problems.
EP087B2013-03-08NoneNoneNoneNone
ET0262013-03-07NoneNoneNoneNone
N13X12013-03-06NoneNoneNoneNone
RL0052013-03-24NoneNoneNoneNone