Experiment | End date |
Friend | Result | Problem |
Text |
EB060B | 2017-05-28 | Uwe | Minor failures | None | The 1pps time comparison signal from the GPS clock was lost and fmout-gps showed a jump. The jump is not real and the DBBC was still in sync with the maser. However, the operator noticed the jump and resynced the DBBC several times between 0:50 and 2:10 UT. Data might be affected by that by small delay jumps and gaps in the data. |
EB060C | 2017-06-10 | Uwe | Minor failures | None | Calibration is only a guess from theory (noise diode is not working), RCP might be broken. |
EG073C | 2017-06-06 | Uwe | Success | None | None |
EG093A | 2017-05-28 | Uwe | Minor failures | WIND | Antenna parked due to thunderstorms from the start to 15:35 UT and 16 to 17:40 UT. |
EG093B | 2017-05-29 | Uwe | Minor failures | WIND | 18:30 to 19:30 UT, stopped because of thunderstorm. |
EG098A | 2017-05-29 | Uwe | Success | None | None |
EG098B | 2017-06-12 | Uwe | Minor failures | None | Calibration is only a guess from theory (noise diode is not working), RCP might be broken. |
EJ019A | 2017-06-09 | Uwe | Minor failures | None | Calibration is only a guess from theory (noise diode is not working), RCP might be broken. |
EJ019B | 2017-06-10 | Uwe | Minor failures | None | Calibration is only a guess from theory (noise diode is not working), RCP might be broken. |
EJ019C | 2017-06-10 | Uwe | Minor failures | None | Calibration is only a guess from theory (noise diode is not working), RCP might be broken. |
EJ019D | 2017-06-11 | Uwe | Minor failures | None | Calibration is only a guess from theory (noise diode is not working), RCP might be broken. |
EK036D | 2017-05-28 | Uwe | Success | None | None |
EM127C | 2017-05-27 | Uwe | Success | None | None |
EM127D | 2017-05-30 | Uwe | Success | None | None |
EM128B | 2017-05-26 | Uwe | Success | None | None |
EM129 | 2017-06-11 | Uwe | Minor failures | None | Calibration is only a guess from theory (noise diode is not working), RCP might be broken. |
EP103C | 2017-05-31 | Uwe | Minor failures | ANT | Problems with socket connection to antenna control PC. Antenna tracked but did not switch between sources between 10:30 and 13 UT and again between 17 and 17:30 UT, because the FS commands were not received. |
EP103D | 2017-06-09 | Uwe | Minor failures | None | Calibration is only a guess from theory (noise diode is not working), RCP might be broken. Observations stopped because of a thunderstorm from 7:50 to 9:45 UT. |
EP104A | 2017-06-01 | Uwe | Success | None | None |
ER045B | 2017-06-08 | Uwe | Minor failures | None | Calibration is only a guess from theory, no noise diode working, RCP might be broken. |
EW019 | 2017-06-01 | Uwe | Success | None | None |
GR040 | 2017-05-31 | Uwe | Success | None | None |
GS039 | 2017-05-27 | Uwe | Success | None | None |
GV022B | 2017-06-08 | Uwe | Minor failures | None | Calibration is only a guess from theory, no noise diode working, RCP might be broken. |
N17C2 | 2017-06-07 | Uwe | Minor failures | None | Lost several scans due to debugging of the receiver and backend system. Calibration is only a guess from theory (noise diode is not working), RCP might be broken. |
N17L2 | 2017-05-25 | Uwe | Success | None | None |
N17M1 | 2017-06-05 | Uwe | Success | None | None |
RE005 | 2017-06-02 | Uwe | Success | None | None |
EB060C | 2017-06-10 | JIVE | Minor failures | None | Broken noise diode so calibration is relatively poor. RCP is broken (very weak phases). Appears to have an issue towards end of experiment ~4:30 - 6:30 UT (much fainter phases both pols). |
EJ019B | 2017-06-10 | JIVE | Failure | None | No Right Circular Polarization (RCP) recorded. |
EJ019C | 2017-06-10 | JIVE | Failure | None | No RCP. |
EJ019D | 2017-06-11 | JIVE | Failure | None | No RCP |
EG098B | 2017-06-12 | JIVE | Failure | None | RCP is broken (very weak phases). Tsys information is not reliable. |
ER045B | 2017-06-08 | JIVE | Failure | None | No data on RR pol for the whole experiment. |
N17C2 | 2017-06-07 | JIVE | Failure | None | Broken RCP in 512 Mbps mode. LCP transmitted only as RCP in 2048 Mbps mode. |
EM129 | 2017-06-11 | JIVE | Failure | None | No RCP recorded |
EP103D | 2017-06-09 | JIVE | Failure | None | No data on RR pols. for the whole experiment |
EB060B | 2017-05-28 | JIVE | Minor failures | None | RCP power seems ~1/2 of LCP for only the lower half of the band. Different dbbc if/clock? |
EG094C | 2017-06-13 | None | None | None | None |
EP104B | 2017-06-12 | None | None | None | None |