EVN feedback tool

Summary for Effelsberg for Session 2016-3

Experiment End date Friend Result Problem Text
EA058A2016-10-29UweSuccessNoneNone
ED040A2016-10-26UweSuccessNoneNone
ED040B2016-11-01UweSuccessNoneNone
EG094B2016-10-27UweSuccessNoneNone
EK036B2016-11-01UweSuccessNoneNone
EM121B2016-10-23UweSuccessNoneNone
EM122A2016-10-22UweSuccessNoneNone
EM123A2016-10-27UweSuccessNoneNone
EM123B2016-10-30UweSuccessNoneNone
EM1242016-10-29UweSuccessNoneNone
EM126A2016-10-24UweSuccessNoneNone
EM126B2016-10-25UweSuccessNoneNone
EM126C2016-10-26UweSuccessNoneNone
EP099A2016-10-24UweSuccessNoneNone
ER045A2016-10-25UweSuccessNoneNone
ES079C2016-10-21UweMinor failuresNoneDue to a power failure at noon an amplifier in the LCP channel was broken and LCP Tsys is 10x higher than the RCP value. Therefore, the LCP SNR will be about 3x lower than usual.
EY0252016-10-23UweSuccessNoneNone
GS038B2016-10-31UweSuccessNoneNone
N16C32016-10-21UweSuccessNoneNone
N16L32016-10-28UweSuccessNoneNone
N16M32016-10-20UweMinor failuresNoneDue to a power failure an hour before the start, that caused a failure of the receiver cooling, observations started somewhat later and ended 30min earlier. An amplifier in LCP seems to be affected as well, Tsys is 10x of the RCP value. Therefore, the LCP SNR in the fringe test was about 3x lower than usual.
EG092C2016-11-02NoneNoneNoneNone
EM122B2016-11-03NoneNoneNoneNone
EP099B2016-11-06NoneNoneNoneNone
EP099C2016-11-08NoneNoneNoneNone
GA0382016-11-15NoneNoneNoneNone
N16K22016-11-04NoneNoneNoneNone
N16X12016-11-07NoneNoneNoneNone