Experiment | End date |
Friend | Result | Problem |
Text |
EA055A | 2014-10-31 | Uwe Bach | Success | None | Sources were below elevation limit until 16:31 UT. |
EA056A | 2014-10-26 | Uwe Bach | Success | None | None |
EA056B | 2014-11-02 | Uwe Bach | Success | None | None |
EG084A | 2014-10-23 | Uwe Bach | Success | None | None |
EG084B | 2014-10-27 | Uwe Bach | Success | None | None |
EL050A | 2014-11-05 | Uwe Bach | Success | None | None |
EP088G | 2014-10-21 | Uwe Bach | Success | None | None |
EP088H | 2014-10-28 | Uwe Bach | Success | None | None |
ER030E | 2014-10-22 | Uwe Bach | Minor failures | WIND | Wind stop from 6:20 to 7:20 UT. |
ER030F | 2014-10-30 | Uwe Bach | Success | None | None |
ER030G | 2014-11-04 | Uwe Bach | Success | None | None |
ES072L | 2014-10-16 | Uwe Bach | Success | None | None |
ES072M | 2014-10-17 | Uwe Bach | Success | None | None |
F14C3 | 2014-10-20 | Uwe Bach | Success | None | None |
F14L3 | 2014-10-27 | Uwe Bach | Success | None | None |
F14M3 | 2014-10-16 | Uwe Bach | Success | None | None |
F14X1 | 2014-11-03 | Uwe Bach | Success | None | None |
GA035A | 2014-10-28 | Uwe Bach | Minor failures | SCHED | Started with the wrong schedule version. Revision 1.0 instead of 2.0. Noticed because phase cal was on in a spectral line observation. Fixed that and observed 2.0 at 12:30 UT. Scan times in 1.0 are the same but phase cal was on for the first 1.5 hours. |
GB075B | 2014-10-20 | Uwe Bach | Success | None | No known problems, but no fringes and the maser was not seen in the NME. Further investigations on the receiver will be done in the gaps between C-band VLBI in the following days. Weather was quite nice, only between 16 UT and 21 UT there was stronger wind with short a rain shower around 20 UT. |
GJ014 | 2014-10-22 | Uwe Bach | Minor failures | WIND | There were two stops due to high wind at 15:00-15:30 UT 18:40-19:55 UT |
GP053B | 2014-10-20 | Uwe Bach | Success | None | None |
GP053B | 2014-10-20 | Uwe Bach | Failure | SCHED | Observed the version 1.1 of the schedule with different times than the final 3.0. Have to check if there is any overlap. |
GP053C | 2014-10-27 | Uwe Bach | Success | None | None |
GP053C | 2014-10-27 | Uwe Bach | Failure | SCHED | Observed the version 1.1 of the schedule with different times than the final 3.0. Have to check if there is any overlap. |
GP053D | 2014-11-03 | Uwe Bach | Success | None | None |
N14C3 | 2014-10-22 | Uwe Bach | Success | None | None |
N14L3 | 2014-10-30 | Uwe Bach | Success | None | None |
N14M3 | 2014-10-17 | Uwe Bach | Success | None | None |
N14Q2 | 2014-10-19 | Uwe Bach | Success | None | No known problems, but no fringes and the maser was not seen. A bit suspicious! Further investigations on the receiver will be done in the gaps between C-band VLBI in the following days. |
N14X1 | 2014-11-04 | Uwe Bach | Success | None | None |