EVN feedback tool

Summary for Effelsberg for Session 2011-3

Experiment End date Friend Result Problem Text
EA0462011-11-09Uwe BachSuccessNoneSchedule was a bit tight for Effelsberg. Antenna was late on sources for a number of scans, but it seems to have happened on purpose. The SCHED summary file already reported that we will be late.
EE008B2011-11-10Uwe BachSuccessNoneNone
EE008B2011-11-10Uwe BachSuccessNoneNone
EE008B2011-11-10Uwe BachSuccessNoneand now with comment: Tsys for the BBC on Ori KL increased to 4000 K, but did not overflow.
EF023B2011-11-04Uwe BachSuccessNoneNone
EG049C2011-10-20Uwe BachMinor failuresRECEProblems to set up receiver in time. 10 min lost at start!
EG0572011-11-01Uwe BachSuccessANT19:54-19:56 antenna control error, 2min lost
EI0112011-11-03Uwe BachSuccessNoneNone
EM084C2011-11-02Uwe BachSuccessNoneNone
EM084D2011-11-04Uwe BachSuccessNoneNone
EP075A2011-10-21Uwe BachMinor failuresANTElevation tracking stopped for unknown reason, causing several other devices to make trouble. Restart took about 1.5 hours. Lost data from 5 to 6:20 UT.
EP0772011-10-31Uwe BachSuccessNoneNone
ER026C2011-10-28Uwe BachSuccessANT14:40-14:44 failure elevation control, 4min lost 18:05-18:08 failure elevation control, 3min lost
ER026D2011-10-29Uwe BachMinor failuresTSYS16:58-17:00 failure elevation control, 2min lost 17:09-17:12 failure elevation control, 3min lost 17:10-21:00 noise diode didn't switch on. No calibration, but data is fine. Will introduce some reasonable numbers to the antabfs-file.
ES066D2011-10-28Uwe BachSuccessNoneNot on source due to long slew from 15:40 to 15:50 UT.
ES066E2011-10-31Uwe BachSuccessNonestopped observing J0359+50 at 0:48 UT because off high elevation >87 deg
ET018A2011-10-21Uwe BachSuccessNoneNone
ET018B2011-10-22Uwe BachSuccessNoneNone
ET018C2011-10-23Uwe BachSuccessNoneNone
ET018D2011-10-24Uwe BachMinor failuresRECEIF power dropped to zero from 14 to 15 UT. Operator solved it but reason for loss is unknown.
ET018E2011-10-26Uwe BachSuccessNoneNone
EY015B2011-11-02Uwe BachSuccessNoneNone
EZ020E2011-10-30Uwe BachSuccessANT13:34-13:38 failure elevation control, 4min lost
GM0682011-11-07Uwe BachSuccessLATEStarted 10min late, because wrong cable wrap direction was commanded by the operator.
GV020G2011-11-05Uwe BachSuccessLATEStarted 5min late. Stopped at 2:06 because source was setting and below elevation limit of 8 deg.
GV020G2011-11-05Uwe BachSuccessNoneNo known problems. The first comment about late start and early stop belongs to re003a.
N11C32011-10-20Uwe BachSuccessNoneall well!
N11K12011-11-09Uwe BachSuccessNoneNone
N11L42011-10-31Uwe BachSuccessNonestarted 1min late.
N11M32011-10-27Uwe BachMinor failuresANTLost scans on J2202+42 from 14:08 to 14:17 due to an elevation tracking failure.
N11X22011-11-07Uwe BachSuccessNoneNone
RE003A2011-11-05Uwe BachSuccessLATEStarted 5min late. Stopped at 2:06 because source was setting and below elevation limit of 8 deg.
RE003B2011-11-09Uwe BachSuccessNoneTsys for the BBC on Ori KL increased to 4000 K, but did not overflow.
RE003B2011-11-09Uwe BachSuccessNoneSorry, Ori KL was EE008