EA046 | 2011-11-09 | Uwe Bach | Success | None | Schedule was a bit tight for Effelsberg. Antenna was late on sources for a number of scans, but it seems to have happened on purpose. The SCHED summary file already reported that we will be late. |
EE008B | 2011-11-10 | Uwe Bach | Success | None | None |
EE008B | 2011-11-10 | Uwe Bach | Success | None | None |
EE008B | 2011-11-10 | Uwe Bach | Success | None | and now with comment: Tsys for the BBC on Ori KL increased to 4000 K, but did not overflow. |
EF023B | 2011-11-04 | Uwe Bach | Success | None | None |
EG049C | 2011-10-20 | Uwe Bach | Minor failures | RECE | Problems to set up receiver in time. 10 min lost at start! |
EG057 | 2011-11-01 | Uwe Bach | Success | ANT | 19:54-19:56 antenna control error, 2min lost |
EI011 | 2011-11-03 | Uwe Bach | Success | None | None |
EM084C | 2011-11-02 | Uwe Bach | Success | None | None |
EM084D | 2011-11-04 | Uwe Bach | Success | None | None |
EP075A | 2011-10-21 | Uwe Bach | Minor failures | ANT | Elevation tracking stopped for unknown reason, causing several other devices to make trouble. Restart took about 1.5 hours. Lost data from 5 to 6:20 UT. |
EP077 | 2011-10-31 | Uwe Bach | Success | None | None |
ER026C | 2011-10-28 | Uwe Bach | Success | ANT | 14:40-14:44 failure elevation control, 4min lost 18:05-18:08 failure elevation control, 3min lost |
ER026D | 2011-10-29 | Uwe Bach | Minor failures | TSYS | 16:58-17:00 failure elevation control, 2min lost 17:09-17:12 failure elevation control, 3min lost 17:10-21:00 noise diode didn't switch on. No calibration, but data is fine. Will introduce some reasonable numbers to the antabfs-file. |
ES066D | 2011-10-28 | Uwe Bach | Success | None | Not on source due to long slew from 15:40 to 15:50 UT. |
ES066E | 2011-10-31 | Uwe Bach | Success | None | stopped observing J0359+50 at 0:48 UT because off high elevation >87 deg |
ET018A | 2011-10-21 | Uwe Bach | Success | None | None |
ET018B | 2011-10-22 | Uwe Bach | Success | None | None |
ET018C | 2011-10-23 | Uwe Bach | Success | None | None |
ET018D | 2011-10-24 | Uwe Bach | Minor failures | RECE | IF power dropped to zero from 14 to 15 UT. Operator solved it but reason for loss is unknown. |
ET018E | 2011-10-26 | Uwe Bach | Success | None | None |
EY015B | 2011-11-02 | Uwe Bach | Success | None | None |
EZ020E | 2011-10-30 | Uwe Bach | Success | ANT | 13:34-13:38 failure elevation control, 4min lost |
GM068 | 2011-11-07 | Uwe Bach | Success | LATE | Started 10min late, because wrong cable wrap direction was commanded by the operator. |
GV020G | 2011-11-05 | Uwe Bach | Success | LATE | Started 5min late. Stopped at 2:06 because source was setting and below elevation limit of 8 deg. |
GV020G | 2011-11-05 | Uwe Bach | Success | None | No known problems. The first comment about late start and early stop belongs to re003a. |
N11C3 | 2011-10-20 | Uwe Bach | Success | None | all well! |
N11K1 | 2011-11-09 | Uwe Bach | Success | None | None |
N11L4 | 2011-10-31 | Uwe Bach | Success | None | started 1min late. |
N11M3 | 2011-10-27 | Uwe Bach | Minor failures | ANT | Lost scans on J2202+42 from 14:08 to 14:17 due to an elevation tracking failure. |
N11X2 | 2011-11-07 | Uwe Bach | Success | None | None |
RE003A | 2011-11-05 | Uwe Bach | Success | LATE | Started 5min late. Stopped at 2:06 because source was setting and below elevation limit of 8 deg. |
RE003B | 2011-11-09 | Uwe Bach | Success | None | Tsys for the BBC on Ori KL increased to 4000 K, but did not overflow. |
RE003B | 2011-11-09 | Uwe Bach | Success | None | Sorry, Ori KL was EE008 |