Experiment | End date |
Friend | Result | Problem |
Text |
EC032 | 2011-06-15 | Uwe Bach | Success | None | None |
EC033 | 2011-06-13 | Uwe Bach | Success | RECO | Probelms with Diskpack. 16-16:30 UT lost. |
EG049B | 2011-06-03 | Uwe Bach | Failure | None | Antenna control PC crashed and couldn't be fixed during the night. Was fixed in the morning after EG049B was over. |
EG051E | 2011-06-02 | Uwe Bach | Success | None | None |
EG051F | 2011-06-03 | Uwe Bach | Success | None | None |
EM084A | 2011-06-16 | Uwe Bach | Success | None | None |
EM084B | 2011-06-16 | Uwe Bach | Success | None | None |
EP068C | 2011-06-01 | Uwe Bach | Minor failures | RECO | First scan lost because of Mark5Server crashed. Recording okay after 12:58 UT |
EP068D | 2011-06-12 | Uwe Bach | Success | None | None |
ER026B | 2011-05-31 | Uwe Bach | Success | None | None |
ES066A | 2011-05-28 | Uwe Bach | Minor failures | FS | LCP lost. Due to an error in the script that produces the procedure files for the DBBC only RCP was recorded. dbbcifa (BBC01-02) and dbbcifb (BBC05-06) both contain RCP data. |
ES066B | 2011-05-29 | Uwe Bach | Minor failures | None | LCP lost. Due to an error in the script that produces the procedure files for the DBBC only RCP was recorded. dbbcifa (BBC01-02) and dbbcifb (BBC05-06) both contain RCP data. |
ES066C | 2011-05-30 | Uwe Bach | Success | None | None |
ES067 | 2011-05-30 | Uwe Bach | Success | None | Procedure files are fixed, and everything is fine again. Both LCP and RCP were observed and recorded. |
ES067 | 2011-05-30 | Uwe Bach | Success | None | Procedure files are fixed, and everything is fine again. Both LCP and RCP were observed and recorded. |
EV018D | 2011-06-02 | Uwe Bach | Success | None | None |
EY015A | 2011-06-10 | Uwe Bach | Minor failures | RECO | Lost first 1.5 hours. Recording okay from 3:50 UT. |
EZ020D | 2011-05-27 | Uwe Bach | Success | None | None |
F11L1 | 2011-06-09 | Uwe Bach | Success | None | No phasecal. Currently the 18/21cm receiver doesn't have phasecal. |
GG074 | 2011-06-09 | Uwe Bach | Success | None | None |
GV020F | 2011-06-11 | Uwe Bach | Minor failures | None | Recording stopped at 7:30 UT because of a broken network switch. No communication between FS and Mark5. |
GV021 | 2011-06-04 | Uwe Bach | Success | None | Strong narrow RFI at 336 MHz, weaker RFI every few MHz all over the band. |
N11C2 | 2011-05-31 | Uwe Bach | Success | None | None |
N11L2 | 2011-06-07 | Uwe Bach | Minor failures | None | First 10 minutes were lost because of a frequency mismatch. |
N11L3 | 2011-06-09 | Uwe Bach | Success | None | First scan lost because of late start |
N11M2 | 2011-05-26 | Uwe Bach | Minor failures | None | Polarizations swapped. Corrected after the NME! |
N11P1 | 2011-06-03 | Uwe Bach | Success | None | Strong narrow RFI at 336 MHz, weaker ones every few MHz. |
RM007 | 2011-06-06 | Uwe Bach | Success | None | Weather got a bit worse at the end. It would have been good to include some pointing gaps every few hours. The operator stole some time in between and did one or two and we had rather large off sets of 10-12 arcsec. This correspond to about 1/3 of the beam width already. |
RT011 | 2011-06-18 | None | None | None | None |