Friend |
Site |
Result |
Problem |
Text |
Tao An |
Shanghai |
Success |
None |
None |
Andrea Orlati |
Medicina |
Success |
None |
light rain during first 2 hours of the observation |
Liu Xiang |
Urumqi |
Success |
None |
It is very clear, with little part of snow in the antenna surface. 8:00--8:14 antenna pc problem. disk2file didn't produce file automatically, we will manually retrieve 2 small scans and ftp to Bologna. |
Michael Lindqvist |
Onsala |
Success |
None |
No known problems. |
A. Kraus |
Effelsberg |
Minor failures |
TSYS SLEW PCAL |
Some problems in the beginning: no Phasecal, no proper Tsys. Reboot of FS at 1040UT, back on source at UT1152, everything fine. Slewing problems (too less time) from UT 1508 on: fixed antenna on 0133+476. |
P. Cassaro at S |
Noto |
Minor failures |
None |
The schedule refused to create the ftp files. |
Ari Mujunen |
Metsahovi |
Minor failures |
LATE |
Four first minutes lost because a large azeloff was left in antenna control after pointing observations. New phase cal system on, injected to IF in receiver in antenna. |
Alastair Gunn |
Cambridge |
Success |
None |
No known problems. |
Alastair Gunn |
Jodrell_Bank |
Success |
None |
MkII was used. No known problems. |