Friend |
Site |
Result |
Problem |
Text |
K. Borkowski |
Torun |
Success |
None |
No known problems. |
Michael Lindqvist |
Onsala |
Minor failures |
PCAL |
We lost phasecal. Noticed around 13.50 UT. |
Roda |
Medicina |
Success |
None |
None |
Xinyong Huang |
Shanghai |
Success |
None |
No known problems. |
Tapasi Ghosh |
Arecibo |
Success |
None |
Power level of the IFs going to the VLBI rack were set to the optimum level at 14:02 (2 mins late) UT. This may not cause any problems as the AGC were working by then anyway. |
Jonathan Quick |
Hartebeesthoek |
Minor failures |
RFI POIN |
Four panels missing due to surface setting procedure. Intermittent sever RFI near 1643.03 MHz. Telescope drive interface failure during gap in schedule 13:47-14:32 UT. |
A. Kraus |
Effelsberg |
Minor failures |
RECO |
First 4 mins lost due to mk5 problems. |
Tony Foley |
Westerbork |
Minor failures |
None |
Wb used in phased array mode. Missing RTB (defective cable - was replaced during the observation). Some RFI -mostly in BBCs 1 and 2 |
Alastair Gunn at S |
Jodrell_Bank |
Success |
None |
MkII was used. No known problems. |
Alastair Gunn at S |
Cambridge |
Success |
None |
No known problems. |
P. Cassaro |
Noto |
Success |
None |
None |