EVN feedback tool

Feedback for GV020A

Friend Site Result Problem Text
Geert Kuper Westerbork Success RFI Wb used in phased array mode. Only RT7 in array. RFI in 1610 MHz USB and 1642 LSB (both RCP and LCP)
scalambra Medicina Success None None
Tapasi Ghosh Arecibo Minor failures SCHED POIN (1) The telescope motion control system wasn't responding to drive commands at the start of the observation. Software restart of several systems were needed. Good data are available from UT 22:07 onwards. (2) For 3C454.3, extra attenuation had to be added to get acceptable power level. Discard data between 22:46 -- 22:52. (3) For the calibrator, J2139+1423, not enough time was allocated for the telescope to reach it. Discard data between 22:50 and 23:00.
Tapasi Ghosh Arecibo Minor failures None CORRECTION: Item(30 above. Discard data between 22:50 -- 23:00 (scan of J2139+1423)
Tapasi Ghosh Arecibo Success None I am having a bad typing day. That time range in item # 3 should be 22:58 -- 23:00 (and NOT 22:50 -- 23:00) Sorry
Kaz Borkowski Torun Minor failures None Operator stopped observations after 23:27 considering the altitudes of remaining sources to be too low.
Uwe Bach Effelsberg Success None None
Michael Lindqvist Onsala Minor failures None Rain + 1 bad scan_check. Strange problem with the noisediode.
P. Cassaro Noto Success None No known problems
Alastair Gunn Jodrell_Bank Success None The Lovell Telescope was used (Jb1). No known problems.
Bob Campbell JIVE Success None correlated in four passes, each with a subset of 2 SBs, to provide the desired number of lags.