EVN feedback tool

Feedback for GM073B

Friend Site Result Problem Text
Mariotti Medicina Success None some RFI on band
PENG LI Urumqi Minor failures None UT 01: 00-09: 45, VEX files generated PRC file to decimate the parameters for errors, modify the parameters of the experiment returned to normal after the decimate.
Bezborodov A. Zelenchukskaya Success None None
Plotnikova, Zhukova, Lysakova Badary Success None None
Shumilova Svetloe Minor failures RECO Scans No0001-N0010 failed due to Mark5B+ problems.
Daniel Valero Yebes Minor failures None wrong sync until 4:00 UTC
Jun Yang Onsala Success None Stowed the telescope due to high winds during 3:40 - 6:02 UT.
Geert Kuper Westerbork Success FS Field system was stopped by accident. Schedule stopped at 10:30 UT and was restarted at 10:38. Recording resumed at 10:48
Uwe Bach Effelsberg Minor failures WIND First half of the time was lost due to strong wind. Observations at Ef started at 8 UT.
Geert Kuper Westerbork Success None Flagr software sometimes slow. The RT is mostly earlier on position as flagr indicates.
P.Cassaro Noto Minor failures TSYS The experiment has been successfully recorded, but the tsys are too high during the whole experiment, due to receiver cooling problems.
Pawel Wolak Torun Success None None
Bo Xia at S Tianma65 Minor failures None Because of the trouble of the power supply before the session started, we found the temperature of the receiver was returning. At UT 7:17, we modified the decimation ratio of the prc file to the correct values. The formatter clock has changed for 2us. So we reloaded the system and recooling. All system was nomal at UT 9:00.
Bo Xia at S Shanghai Failure None Didn't observe dut to the maintenance.