Friend |
Site |
Result |
Problem |
Text |
Andrea Orlati |
Medicina |
Minor failures |
FS |
Prc file was not properly loaded so schedule couldn't initialize the system, in particular VC frequency was not correct. Problem solved starting from 9:31 UT. 2 scans were lost. |
Michael Lindqvist |
Onsala |
Success |
None |
No known problems. Tape shiped. |
Ari Mujunen |
Metsahovi |
Minor failures |
RECO HIGH PCAL |
Constant dry snowfall. Recorder headstack 1 worn to -20um, increased vacuum from 5in to 9in, abandoning thick tape swapping. No phasecal injection. Tape shipped with DHL (448 2592 192) and recorded to TRACK. Putting logs on vlbeer shortly. Please use GPS data only starting from 16-Jan-2003, the date of last adjustment. (Current offset -32.5used, rate estimate is +5.26nsec/day or +0.061psec/s.) |
P. Cassaro |
Noto |
Minor failures |
POIN |
A couple of times the antenna was slightly in late in reach the sources. |
for A.G.) |
Jodrell_Bank |
Success |
None |
None |
for A.G.) |
Cambridge |
Minor failures |
RECO |
Due to a failure of the headstack, track 30 on the VLBA recorder has been remapped to track 34, i.e. third system track. Please take this into account when correlating. This will also be the case for the other Cm experiments. Also there was an error message from the Formatter suggesting an incorrect sampler assignment (see log). |