EVN feedback tool

Feedback for ES055

Friend Site Result Problem Text
Tao An Shanghai Success None None
Zhang hua Urumqi Success None None
Michael Lindqvist Onsala Success None Only one (1) tsys in the schedule. The experiment consists of a single scan ==> Problem with disk change, see mail from Alastair.
Kaz Borkowski Torun Minor failures None Off source from 12:17 to 12:31 due to an electricity outage. No other known problems (the single big file has luckily fit on current diskpack).
Andrea Orlati Medicina Success None Experiment contains one huge scan (1.6 TB). We were forced to do a bank switch manually. No other problems were spotted.
Tony Foley Westerbork Success None Wb used in phased array mode. No known problems
A. Kraus Effelsberg Minor failures RECO HIGH Same problem as Mc, On, JB with the one single scan. Problems when bank switch was due: data lost between UT0432-0641. The only scheduled T_sys measurement in the beginning was corrupt as the telescope was partly shadowed by surrounding hills. Added a second measurement at the end.
Alastair Gunn Jodrell_Bank Minor failures WIND SCHED The Lovell Telescope was used. Telescope parked due to high winds between 02:52 and 04:41 UT. Telescope was not making source changes in time during zenith transits. No other known problems. Managed to find a disk pack large enough for the single 1.6 TB scan!