Friend |
Site |
Result |
Problem |
Text |
K. Borkowski |
Torun |
Minor failures |
None |
BBC3 unlocked (same problem as in GD018). No other known problems. |
Andrea Orlati |
Medicina |
Minor failures |
LATE |
schedule starts 10 minutes late. |
Michael Lindqvist |
Onsala |
Success |
None |
No known problems. |
Alastair Gunn |
Jodrell_Bank |
Success |
None |
The Lovell Telescope was used. The schedule was altered to limit the number of phase calibrator source changes; some scans will not fringe. No known problems. |
Alastair Gunn |
Cambridge |
Minor failures |
None |
The microwave link failed prior to this experiment due to heavy snow. Data may be good after about 15:48 UT, but link may have been intermittent. No other known problems. |
A. Kraus |
Effelsberg |
Minor failures |
None |
Computer problems (frontend control) in the beginning: 11 mins late. Stopped due to snow: UT1931-2016, 2355-0013, 0428-0440. |
Tony Foley |
Westerbork |
Minor failures |
None |
Wb used in phased array mode. The snow has gone! Tsys getting back to normal |
P. Cassaro |
Noto |
Success |
None |
None |