EVN feedback tool

Feedback for ES046

Friend Site Result Problem Text
Huang Xinyong at S Shanghai Success None None
yangwenjun Urumqi Success None None
Michael Lindqvist Onsala Success None No known problems.
A. Kraus Effelsberg Minor failures None During the experiment, the operator informed me about differences between the printed schedule and the real observations. Checking vlbeer, I noted that the PI updated only the .key, .skd, and the .sch.xx files, but not the es046crd.eb which controls our VLBA-type fieldsystem. Using the new .key-file, I ran sched, and installed the correct schedule at UT1652.
Alastair Gunn Jodrell_Bank Success None No known problems.
K.Borkowski Torun Minor failures None We lost two scans (at 14:46 and 15:43) because of too long slewing and lost all observations after 22:40 (till midnight) because of antenna control problems (old sensors in azimuth sometimes generate false signals causing a havoc).
A.Maccaferri Medicina Success None None
Tony Foley Westerbork Minor failures PHAS IF stuck 15:38 to 16:05 UT
Tony Foley Westerbork Minor failures HA-E PHAS Many scans out of HA range
Tony Foley Westerbork Minor failures PHAS IF for telescope D stuck 22:38 to 22:46UT
Tony Foley Westerbork Minor failures PHAS IF for telescope D stuck 22:38 to 22:46UT