EVN feedback tool

Feedback for EM051

Friend Site Result Problem Text
Xinyong Huang Shanghai Minor failures RFI Seshan station stop the schedule at UT: 142_20:18:04, because of the sources out of our antenna's limit.
A.Maccaferri Medicina Minor failures RECO FS After tape change, recorder did not start, some command for markV, avoid tape to restart after label command. Lost about 20 minutes afetr tape change and about the same at the end of first pass.
A.Maccaferri Medicina Minor failures RECO FS After tape change, recorder did not start, some command for markV, avoid tape to restart after label command. Lost about 20 minutes afetr tape change and about the same at the end of first pass.
yangwj Urumqi Success None from the UT 23:45,the source is outside telescope limits.
K.Borkowski Torun Success None Due to long passes in Az 3 consecutive scans were affected: lost at 20:38, and about 3 min. late on source at 20:21 and 20:40. No other known problems.
Michael Lindqvist Onsala Success None No known problems.
A. Kraus at S Effelsberg Minor failures FS Due to problems with our VLBA-FS, the last 45 minutes were lost
P. Cassaro Noto Success None None
P. Cassaro Noto Success None None
Alastair Gunn Jodrell_Bank Success None None
Alastair Gunn Cambridge Success None Reduced signal level in BBCs 1,2,7,8 due to MERLIN link restrictions.
Liu Xiang Urumqi Minor failures TSYS FS Comment: the lowest Tsys of BBCs in logfile (like 23K at LCP, 12K at RCP) should corresponds to 22K at LCP and 22K at RCP as we measured with radiometer; the FS has some problem with Tsys measure. so you could use a correction factor from above in ANTAB.
foley Westerbork Minor failures PHAS RTB unreliable. Used 13 telescopes in the array