Tao An Shanghai Failure FORM The formatter has a sync problem when starting EL033B. An error message "Clock is syncing" was occuring every several minutes. When the message shows, the formatter time is reseted to 2000. The power supply of formatter is normal: 5.1V and -5.0V. The problem is being checked, and we are grateful to any suggestions from VLBIers.
Kaz Borkowski Torun Minor failures RECO Scans between 4:00 and 5:06 lost due to problems with Mk5 recording (suspect as the cause is the power supply, that apparently couldn't feed two DPs together; presently we work with only one pack inserted).
Michael Lindqvist Onsala Success None Cloudy weather, snow during night. Otherwise no known problems.
Zhang Hua Urumqi Minor failures None Experiment start time at 18:35 UT,because of terminal trouble. From 23:10 to 23:46 UT Bank B is stop work,this disk label is "osod-050". I am check this disk,used "ssopen" and "SSReset" is ok.but it cann't work. So I am use a new disk. El033b used four diskes: uao-0016 osod-050 jive-029 med-0020
C.Bortolotti Medicina Success None None
Tony Foley Westerbork Minor failures PHAS Wb used in phased array mode. tied array IF System had a problem in the 5th band with system ticks from 20:54 - 21:20UT. The system was rebooted in a gap about 21:20 and phases re-zeroed at 21:40UT. Otherwise OK.
P. Cassaro Noto Failure FORM From 23:21 UT to the end of the experiment the formatter has not been synchronized.
dgraham at S Effelsberg Minor failures SCHED First 2 scans lost to thunderstorm. Heavy rain particularly 22-24UT. Few scans lost for slewing
Alastair Gunn Jodrell_Bank Minor failures ANT The MkII telescope was used (Jb2). Telescope communication problems at about 06:00 UT. Required interface reset. No other known problems.