EVN feedback tool

Feedback for EK038C

Friend Site Result Problem Text
Mauro Medicina Success , , , , , , , , , , , , , , all scan recorded clear sky
Roberts Irbene Minor failures , , , , , , , , , , , , , , Our main electricity line kinda scared from one cloud storm, which carried inside a few lightning booms. In result there was a power cut-off, and so the scan 0039 to 0041 were partly recorded, while antenna was not moving.
Miguel Sanz Yebes Success , , , , , , , , , , , , , , No known failures
Hua zhang Urumqi Success , , , , , , , , , , , , , , None
Jonathan Quick Hartebeesthoek Success , , , , , , , , , , , , , , No known problems.
Ptitcin A. Zelenchukskaya Success , , , , , , , , , , , , , , Scans from no0070 to no0080 missed due to participation in intensive geo session
Isaenko O. Svetloe Success , , , , , , , , , , , , , , None
Zadrutsky Badary Success , , , , , , , , , , , , , , Skipped scans from no0079 to ni0080 due to intensive geo session
BoXia Tianma65 Success , , , , , , , , , , , , , , None
Eskil Varenius Jodrell_Bank Minor failures , , , , , , LATE, , , , , , , , Late start due to operator error. Joined from scan0033. No known issues after that.
P. Cassaro Noto Success , , , , , , , , , , , , , , None
Jun Yang Onsala Success , , , , , , , , , , , , , , None
Uwe Bach Effelsberg Minor failures , , , , WIND, , , , , , , , , , Started late. Due to strong wind Ef could only start observations at 17:30 UT.
Blaauw Westerbork Success , , , , WIND, , , , , , , , , , thunderstorm (1730-1800 UT)
JIVE Effelsberg Failure None Late start due to strong wind, joined from scan 35.
JIVE Westerbork Minor failures None Late start due to thunderstorm, joined from scan 35.
JIVE Jodrell_Bank Minor failures None Late start, joined from scan 33.
JIVE Zelenchukskaya Minor failures None Scans 70-80 are missed, due to overlap with geo session.
JIVE Badary Minor failures None Scans 79-80 are missed, due to overlap with geo session.
JIVE Irbene Minor failures None Scans 39-41 are partly recorded, due to power cut-off.
JIVE Urumqi Minor failures None Antab files from the telescope are temporarily unavailable due to a problem with the script that generates them. A nominal file is used.
JIVE Effelsberg Minor failures None Late start due to strong wind, joined from scan 35.
JIVE Westerbork Minor failures None Late start due to thunderstorm, joined from scan 35.
JIVE Jodrell_Bank Minor failures None Late start, joined from scan 33.
JIVE Zelenchukskaya Minor failures None Scans 70-80 are missed, due to overlap with geo session.
JIVE Badary Minor failures None Scans 79-80 are missed, due to overlap with geo session.
JIVE Irbene Minor failures None Scans 39-41 are partly recorded, due to power cut-off.
JIVE Urumqi Minor failures None Antab files from the telescope are temporarily unavailable due to a problem with the script that generates them. A nominal file is used.