EVN feedback tool

Feedback for EH010

Friend Site Result Problem Text
yang wen jun Urumqi Success None The experiment was ended at UT 08:41 because of the following source is outside dish limits.
yang wen jun Urumqi Success None Because we have not enough hard-disk, so, the data of ek020a,ez013 and eh010 were all recorded in the same hard-disk,the number of disk is cmva-010 aoed.
K. Borkowski Torun Success None No known problems.
Michael Lindqvist Onsala Success None No known problems.
Zacchiroli Medicina Minor failures None Stopped from 07:29:00 till 09:15:20 for antenna problems
Jonathan Quick Hartebeesthoek Minor failures SLEW RFI Intermittent RFI throughout observation. Antenna drive interface failed at 08:00 UT, restarted 08:36 on calibrator but failed again at 08:50 with Declination axis brake failure. Source had set below local horizon by then so we ended experiment early.
Alastair Gunn Jodrell_Bank Minor failures None The Lovell Telescope was used. The schedule was altered to limit the number of phase calibrator source changes; some scans will not fringe. Schedule refused to append data to disk pack at experiment start. Changed disk pack and began recording manually at 23:01:22 UT. No other known problems.
Alastair Gunn Cambridge Success None No known problems.
Tao An Shanghai Minor failures FS Due to FS and MK5 problem, we lost scans from No0010 to No0013.
A. Kraus Effelsberg Success None None
P. Cassaro Noto Minor failures POIN From 05:00 to 06:00 UT pointing problems due to high elevation.