EVN feedback tool

Feedback for EC057B

Friend Site Result Problem Text
Cristina Garcia Miro Robledo Failure ANT After "Follow the Sun" DSN installation and testing antenna controller was declared red. Not possible to observe.
Lysenkova M. Zelenchukskaya Success None None
Zhiritsky Badary Success None None
Isaenko O. Svetloe Minor failures RECO Scans No0001-No0007 missed due to Mark5B+ problems.
Nocita Noto Success None None
Jun Yang Onsala Success None None
Uwe Effelsberg Minor failures WIND Only some 30 minutes lost at the end of the observations because of wind stop at 11:30 UT.
Peng Li Urumqi Failure None Because the moon observation, not observed in this experiment
Daniel Valero Yebes Minor failures None dbbc firmware didn't work properly at bbc1 and bbc3 until scan no0016
Roda Medicina Success None None
Uwe Effelsberg Success None Some additional notes on the weather: heavy rain and windy most of the time and therefore higher Tsys than usual.
P.Cassaro at S Noto Success None None
Jun Yang Onsala Success None Light snow at the beginning of the observations.
Pawel Wolak Torun Success None None