EVN feedback tool

Feedback for EC044

Friend Site Result Problem Text
Daniel Valero Yebes Minor failures TSYS First 20 scan without tsys: Problem to the frequency 5280
K. Borkowski Torun Minor failures HIGH ANT First scan observed with very high Tsys (the reason seems to have something to do with change of HF filters, but is somewhat misterious and will be further investigated). Since 1:44 UTC for about one hour the FS lost telescope control which in this case means that during this period the telescope tracked continuously only one source (K3-35).
P. Cassaro Noto Failure RECE The LO was wrongly set up for all the experiment.
Geert Kuper Westerbork Success None None
Bo Xia Shanghai Success None None
Bo Xia Shanghai Success None None
Jimmy Cullen Jodrell_Bank Minor failures FS Control computer failed causing loss of data 20:40 - 21:14 UT and 03:30 - 03:55 UT
Jun Yang Onsala Minor failures ANT The fuse associated with the Declination motor was blew again at night. The exact time was at ~0:40 UT. After that, the antenna could only track the calibrator J1925+2106. The observations stopped at 3:40 UT when the operator noticed the problem.
Uwe Bach Effelsberg Success None None