EVN feedback tool

Feedback for EC026

Friend Site Result Problem Text
Bo Xia Shanghai Success None None
Hua Zhang Urumqi Minor failures None Form 5:33 to 5:45UT,The Mark5A computer can't record,Restart the Mark5A computer is ok. Form 6:54 to 7:24UT,The 5HMz signal throw to lose.
Kaz Borkowski Torun Success None No known problems.
Michael Lindqvist Onsala Success None Bad weather, rain, otherwise no known problems. Few preob in schedule, thus few Tsys-measurments results.
G.Maccaferri Medicina Success None None
Uwe Bach Effelsberg Minor failures WIND Started two scans later, because of a power failure and stopped at about 5 UT because of high wind.
P. Cassaro Noto Success None None
Geert Kuper Westerbork Minor failures None Wb used in phased array mode. 12 telescopes in array iso 13
Alastair Gunn Jodrell_Bank Failure WIND The Lovell Telescope was used (Jb1). Telescope parked due to high winds for entire experiment.
Alastair Gunn Cambridge Minor failures WIND Cambridge was not on source at start of experiment due to high winds, but was on source by 00:08 UT. Observed until 06:14 UT when winds were high again. No other known problems.