EVN feedback tool

Feedback for EC020B

Friend Site Result Problem Text
P. Cassaro Noto Minor failures RFI None
K.Borkowski Torun Success None No known problems.
A. Maccaferri Medicina Minor failures RECO From start to 16:06 second tape head was disconnected, so no record until that in these tape track. Lost scans from 27 may 9:50 to 10:33.
Michael Lindqvist Onsala Success None No known problems.
A. Kraus Effelsberg Minor failures RFI None
P. Cassaro Noto Minor failures RECO RFI Severe RFI in the band. Scan from 140 to 151 losts due to lost of vacuum of the recorder. Please ignore the previous feedback of Noto (TOO early!)
Alastair Gunn Jodrell_Bank Minor failures None LO setting may have been wrong for first 40 minutes due to a power glitch. Tape lost vaccuum at 23:45, back on for 23:56 pass. Vacuum lost again at 00:45, not recovered until next tape change (37 minutes). Source 10173+0828 was not observed due to error in MERLIN schedule.
Alastair Gunn Cambridge Minor failures None source 10173+0828 not observed due to error in MERLIN schedule. No other known problems.
foley Westerbork Failure None observations before 07:03 lost with restarting systems after power failure
foley Westerbork Failure RECO PHAS observations after 07:03 headstack 2 not connected until 15:59 (not noticed after power off) Only stack1 recording
foley Westerbork Minor failures RECO PHAS RTB unreliable. Used 13 telescopes in the array