| Friend | Site | Result | Problem | Text |
|---|---|---|---|---|
| Tao An | Shanghai | Success | None | None |
| Andrea Orlati | Medicina | Success | None | light rain during first 2 hours of the observation |
| Liu Xiang | Urumqi | Success | None | It is very clear, with little part of snow in the antenna surface. 8:00--8:14 antenna pc problem. disk2file didn't produce file automatically, we will manually retrieve 2 small scans and ftp to Bologna. |
| Michael Lindqvist | Onsala | Success | None | No known problems. |
| A. Kraus | Effelsberg | Minor failures | TSYS SLEW PCAL | Some problems in the beginning: no Phasecal, no proper Tsys. Reboot of FS at 1040UT, back on source at UT1152, everything fine. Slewing problems (too less time) from UT 1508 on: fixed antenna on 0133+476. |
| P. Cassaro at S | Noto | Minor failures | None | The schedule refused to create the ftp files. |
| Ari Mujunen | Metsahovi | Minor failures | LATE | Four first minutes lost because a large azeloff was left in antenna control after pointing observations. New phase cal system on, injected to IF in receiver in antenna. |
| Alastair Gunn | Cambridge | Success | None | No known problems. |
| Alastair Gunn | Jodrell_Bank | Success | None | MkII was used. No known problems. |