| Friend | Site | Result | Problem | Text |
|---|---|---|---|---|
| Michael Lindqvist | Onsala | Success | None | Apart from RFI. No known problems. |
| Andrea Orlati | Medicina | Minor failures | LATE | Schedule launch was 90 minutes late due to a block in the telescope driving computer. |
| Bo Xia | Shanghai | Minor failures | None | From UT 10:30 to UT 10:46(No0001-No0003),the connection of the mk5 device and the clock pc is time-out with the network preoblem, so we cannot get the useful date. Form UT 10:47 to UT 10:59(No0004-No0006),the scan_check is failure,so we change to another diskpack. Two bad scan_check with 44 and 76 . |
| Wenjun Yang | Urumqi | Minor failures | HIGH | It is rainy and a little snow. From UT16:38 to 16:58, about three scans were lost because of the diskpack failure, quited mark5A system at UT16:38 and restarted recording at UT16:58. And there is warning message "Mark5A Warning:Recording throttled(can' keep up)" in Mark5A machine, no other error message. we will put Mark5A log file on to vlbeer's ftp server later. |
| Kaz Borkowski | Torun | Success | RFI | No known problems but RFI. |
| Geert Kuper | Westerbork | Minor failures | None | Wb used in phased array mode. We had only 11 out of 13 RT's in our array. RT 7 and C needed repair. There was a restart from 14:04:05 till 14:07:45 UT. This restart was needed to resync TADU input module 3 and 5. These 2 modules showed an error condition that startede at 13:42:05 UT |
| Andrea Orlati | Medicina | Minor failures | LATE | Schedule launch was 90 minutes late due to a block in the telescope driving computer. |
| Uwe Bach | Effelsberg | Success | None | None |
| Alastair Gunn | Jodrell_Bank | Success | None | The Lovell Telescope was used (Jb1). No known problems. |
| P. Cassaro | Noto | Success | RECO | The observation was stopped for a few minutes due to problems with the recorder, around 12:00 UT. |