| Friend | Site | Result | Problem | Text |
|---|---|---|---|---|
| Ptitcin A. | Zelenchukskaya | Success | None | Scans from No0030 to No0044 missed due to participation in intensive geo session |
| Andreeva T. | Svetloe | Minor failures | WIND | Scans No0015- No0026 failed due to thunderstorm. |
| Zhukova | Badary | Success | None | Pause for intensive geo session (scans no0038-1942) |
| Salvo Buttaccio | Noto | Minor failures | RECO | mk5 bank switch failure. About 1 hour lost. |
| Jonathan Quick | Hartebeesthoek | Success | None | No known problems apart from the usual RFI in the lowest two sub-bands |
| K. Borkowski | Torun | Success | None | No known problems. |
| Geert Kuper | Westerbork | Minor failures | PHAS | From 14:00 - 16:53 UT RT9 gave no signal but was not excluded from the adding box. After 16:53 excluded. |
| Jimmy Cullen | Jodrell_Bank | Success | None | Due to a bogie failure, the Lovell was replaced by the MkII for this observation. Otherwise no problems. |
| Jun Yang | Onsala | Success | None | No known problems. |
| Uwe Bach | Effelsberg | Minor failures | LATE | Start 1h late, because of focus control problems. |
| Cristina Garcia Miro | Robledo | Minor failures | TSYS LATE | DVP configuration script not properly defined regarding channels definition (channels 5 and 7) and IF input. Problem corrected in real-time. As a result 2 first sources not properly recorded (scans 64&65). All channels (1-8) injected to L-LCP (only pol available). L-band noise diode red, no tsys data available. Mark5C VDIF recording, label=JPL-0050/4000 |